Cross-country pipelines and flow lines to ASME B31.4/B31.8 and API 1104, welded automatically or by hand.

Pipeline construction

We build pipelines and flow lines to international codes, including ASME B31.4 and B31.8 and API 1104, 1102 and 1110.

Welding methods

  • Automatic and semi-automatic welding for high quality and high productivity: GMAW with STT machines for the root pass, and FCAW with fully automatic Piper Bug welders for the other passes.
  • Manual welding with SMAW, GTAW or both.

What we cover

  • Topographic and geotechnical site survey and route marking
  • Right of way, clearing and grading
  • Pipe transport and stringing
  • Trenching, and backfilling with clean soil
  • Welding procedures (WPS, PQR) and welder qualification tests
  • Line welding, automatic or manual
  • NDT: RT with crawlers or directional sources, UT, and AUT where required
  • PWHT where required
  • Road, railway and river crossings to API 1102
  • Lowering-in, backfilling and tie-in welding
  • Concrete weight coating and slabs
  • Cathodic protection, temporary (SACP) and permanent (ICCP)
  • Field joint coating and coating repair
  • Fibre optic cable installation
  • Pig launcher and receiver installation
  • Valve stations and wellhead connections
  • Hydrostatic testing: cleaning, filling, pressurising and dewatering
  • Pre-commissioning, drying and purging, and support during commissioning
  • As-built drawings