We build pipelines and flow lines to international codes, including ASME B31.4 and B31.8 and API 1104, 1102 and 1110.
Welding methods
- Automatic and semi-automatic welding for high quality and high productivity: GMAW with STT machines for the root pass, and FCAW with fully automatic Piper Bug welders for the other passes.
- Manual welding with SMAW, GTAW or both.
What we cover
- Topographic and geotechnical site survey and route marking
- Right of way, clearing and grading
- Pipe transport and stringing
- Trenching, and backfilling with clean soil
- Welding procedures (WPS, PQR) and welder qualification tests
- Line welding, automatic or manual
- NDT: RT with crawlers or directional sources, UT, and AUT where required
- PWHT where required
- Road, railway and river crossings to API 1102
- Lowering-in, backfilling and tie-in welding
- Concrete weight coating and slabs
- Cathodic protection, temporary (SACP) and permanent (ICCP)
- Field joint coating and coating repair
- Fibre optic cable installation
- Pig launcher and receiver installation
- Valve stations and wellhead connections
- Hydrostatic testing: cleaning, filling, pressurising and dewatering
- Pre-commissioning, drying and purging, and support during commissioning
- As-built drawings